Date oficiale · National Institute of Statistics (INS)

Building permits in Argeș County

How many building permits for residential buildings are issued each month in Argeș County.

Ranked 6 of 42, in August 2026.

Building permits

123 permits

August 2026

+59 (+92.19%) vs July 2026 +35 (+39.77%) vs August 2025

The “Building permits” series

Series high
319 permitsDecember 2006
Series low
38 permitsJanuary 2003
Months published
296since January 2002

Trends

Building permits · solid line
Building permits in Argeș County, Last 10 years The monthly trend of Building permits in Argeș County, from September 2016 to August 2026, in permits. Valoarea a trecut de la 123 la 123. The exact figures are in the table below. 50 100 150 200 250 maxim 241 minim 55 123
Building permits · solid line
Building permits in Argeș County, Last 12 months The monthly trend of Building permits in Argeș County, from September 2025 to August 2026, in permits. Valoarea a trecut de la 122 la 123. The exact figures are in the table below. 40 60 80 100 120 140 minim 55 123

What it means

A building permit is the act of the local administration on the basis of which the rules on the siting, design, execution and operation of constructions are applied. It is issued with a view to the START of the works, so their number says what is intended to be built, not what was built.

The forms are filled in by the prefectures and by the county and local councils. The figures here are for residential buildings, excluding those for communities, and they also cover extensions to existing residential buildings.

A county's figures are small, so the change from one month to the next is large by chance: a few permits more or fewer move the percentage a great deal. The comparison that says something is the one with the same month of the previous year, because the series is strongly seasonal — construction is authorised in summer.

The 42 counties add up exactly to the national figure, checked at every import.

History

The last 24 months. The figures are in permits.
Period Building permits
August 2026 123
July 2026 64
June 2026 110
May 2026 88
April 2026 75
March 2026 95
February 2026 71
January 2026 55
December 2025 99
November 2025 105
October 2025 116
September 2025 122
August 2025 88
July 2025 147
June 2025 129
May 2025 140
April 2025 125
March 2025 101
February 2025 85
January 2025 75
December 2024 78
November 2024 118
October 2024 109
September 2024 123

Toate the counties

AlbaAradArgeșBacăuBihorBistrița-NăsăudBotoșaniBrăilaBrașovBuzăuCălărașiCaraș-SeverinClujConstanțaCovasnaDâmbovițaDoljGalațiGiurgiuGorjHarghitaHunedoaraIalomițaIașiIlfovMaramureșMehedințiBucharest MunicipalityMureșNeamțOltPrahovaSălajSatu MareSibiuSuceavaTeleormanTimișTulceaVâlceaVasluiVrancea

Source: National Institute of Statistics (INS), matrix LOC108A. Period covered: January 2002 – August 2026. See the source.

The series is for residential buildings, excluding those for communities. Unlike the national figure, which is published unbroken across all 295 months, a county may have months with no published figure at all — the chart breaks there, no line is drawn across. The series is strongly seasonal, so the comparison that says something is the one with the same month of the previous year.