Date oficiale · National Institute of Statistics (INS)

Building permits in Prahova County

How many building permits for residential buildings are issued each month in Prahova County.

Ranked 10 of 42, in August 2026.

Building permits

89 permits

August 2026

−20 (−18.35%) vs July 2026 −45 (−33.58%) vs August 2025

The “Building permits” series

Series high
287 permitsJuly 2007
Series low
22 permitsJanuary 2004
Months published
296since January 2002

Trends

Building permits · solid line
Building permits in Prahova County, Last 10 years The monthly trend of Building permits in Prahova County, from September 2016 to August 2026, in permits. Valoarea a trecut de la 108 la 89. The exact figures are in the table below. 0 50 100 150 200 maxim 182 minim 48 89
Building permits · solid line
Building permits in Prahova County, Last 12 months The monthly trend of Building permits in Prahova County, from September 2025 to August 2026, in permits. Valoarea a trecut de la 107 la 89. The exact figures are in the table below. 60 80 100 120 140 maxim 128 minim 73 89

What it means

A building permit is the act of the local administration on the basis of which the rules on the siting, design, execution and operation of constructions are applied. It is issued with a view to the START of the works, so their number says what is intended to be built, not what was built.

The forms are filled in by the prefectures and by the county and local councils. The figures here are for residential buildings, excluding those for communities, and they also cover extensions to existing residential buildings.

A county's figures are small, so the change from one month to the next is large by chance: a few permits more or fewer move the percentage a great deal. The comparison that says something is the one with the same month of the previous year, because the series is strongly seasonal — construction is authorised in summer.

The 42 counties add up exactly to the national figure, checked at every import.

History

The last 24 months. The figures are in permits.
Period Building permits
August 2026 89
July 2026 109
June 2026 117
May 2026 106
April 2026 106
March 2026 118
February 2026 96
January 2026 73
December 2025 87
November 2025 102
October 2025 128
September 2025 107
August 2025 134
July 2025 109
June 2025 140
May 2025 98
April 2025 127
March 2025 119
February 2025 67
January 2025 48
December 2024 67
November 2024 88
October 2024 110
September 2024 102

Toate the counties

AlbaAradArgeșBacăuBihorBistrița-NăsăudBotoșaniBrăilaBrașovBuzăuCălărașiCaraș-SeverinClujConstanțaCovasnaDâmbovițaDoljGalațiGiurgiuGorjHarghitaHunedoaraIalomițaIașiIlfovMaramureșMehedințiBucharest MunicipalityMureșNeamțOltPrahovaSălajSatu MareSibiuSuceavaTeleormanTimișTulceaVâlceaVasluiVrancea

Source: National Institute of Statistics (INS), matrix LOC108A. Period covered: January 2002 – August 2026. See the source.

The series is for residential buildings, excluding those for communities. Unlike the national figure, which is published unbroken across all 295 months, a county may have months with no published figure at all — the chart breaks there, no line is drawn across. The series is strongly seasonal, so the comparison that says something is the one with the same month of the previous year.