Date oficiale · National Institute of Statistics (INS)

Building permits in Brăila County

How many building permits for residential buildings are issued each month in Brăila County.

Ranked 38 of 42, in August 2026.

Building permits

21 permits

August 2026

+4 (+23.53%) vs July 2026 −9 (−30.00%) vs August 2025

The “Building permits” series

Series high
121 permitsAugust 2013
Series low
8 permitsJanuary 2023
Months published
296since January 2002

Trends

Building permits · solid line
Building permits in Brăila County, Last 10 years The monthly trend of Building permits in Brăila County, from September 2016 to August 2026, in permits. Valoarea a trecut de la 31 la 21. The exact figures are in the table below. 0 20 40 60 80 maxim 76 minim 8 21
Building permits · solid line
Building permits in Brăila County, Last 12 months The monthly trend of Building permits in Brăila County, from September 2025 to August 2026, in permits. Valoarea a trecut de la 21 la 21. The exact figures are in the table below. 10 15 20 25 30 35 maxim 33 minim 13 21

What it means

A building permit is the act of the local administration on the basis of which the rules on the siting, design, execution and operation of constructions are applied. It is issued with a view to the START of the works, so their number says what is intended to be built, not what was built.

The forms are filled in by the prefectures and by the county and local councils. The figures here are for residential buildings, excluding those for communities, and they also cover extensions to existing residential buildings.

A county's figures are small, so the change from one month to the next is large by chance: a few permits more or fewer move the percentage a great deal. The comparison that says something is the one with the same month of the previous year, because the series is strongly seasonal — construction is authorised in summer.

The 42 counties add up exactly to the national figure, checked at every import.

History

The last 24 months. The figures are in permits.
Period Building permits
August 2026 21
July 2026 17
June 2026 28
May 2026 23
April 2026 29
March 2026 27
February 2026 15
January 2026 13
December 2025 33
November 2025 18
October 2025 15
September 2025 21
August 2025 30
July 2025 20
June 2025 33
May 2025 36
April 2025 36
March 2025 28
February 2025 39
January 2025 14
December 2024 29
November 2024 15
October 2024 27
September 2024 29

Toate the counties

AlbaAradArgeșBacăuBihorBistrița-NăsăudBotoșaniBrăilaBrașovBuzăuCălărașiCaraș-SeverinClujConstanțaCovasnaDâmbovițaDoljGalațiGiurgiuGorjHarghitaHunedoaraIalomițaIașiIlfovMaramureșMehedințiBucharest MunicipalityMureșNeamțOltPrahovaSălajSatu MareSibiuSuceavaTeleormanTimișTulceaVâlceaVasluiVrancea

Source: National Institute of Statistics (INS), matrix LOC108A. Period covered: January 2002 – August 2026. See the source.

The series is for residential buildings, excluding those for communities. Unlike the national figure, which is published unbroken across all 295 months, a county may have months with no published figure at all — the chart breaks there, no line is drawn across. The series is strongly seasonal, so the comparison that says something is the one with the same month of the previous year.