Date oficiale · National Institute of Statistics (INS)

Building permits in Botoșani County

How many building permits for residential buildings are issued each month in Botoșani County.

Ranked 26 of 42, in August 2026.

Building permits

44 permits

August 2026

−24 (−35.29%) vs July 2026 −15 (−25.42%) vs August 2025

The “Building permits” series

Series high
259 permitsAugust 2008
Series low
4 permitsJanuary 2003
Months published
296since January 2002

Trends

Building permits · solid line
Building permits in Botoșani County, Last 10 years The monthly trend of Building permits in Botoșani County, from September 2016 to August 2026, in permits. Valoarea a trecut de la 84 la 44. The exact figures are in the table below. 0 50 100 150 maxim 137 minim 14 44
Building permits · solid line
Building permits in Botoșani County, Last 12 months The monthly trend of Building permits in Botoșani County, from September 2025 to August 2026, in permits. Valoarea a trecut de la 47 la 44. The exact figures are in the table below. 30 40 50 60 70 maxim 68 minim 32 44

What it means

A building permit is the act of the local administration on the basis of which the rules on the siting, design, execution and operation of constructions are applied. It is issued with a view to the START of the works, so their number says what is intended to be built, not what was built.

The forms are filled in by the prefectures and by the county and local councils. The figures here are for residential buildings, excluding those for communities, and they also cover extensions to existing residential buildings.

A county's figures are small, so the change from one month to the next is large by chance: a few permits more or fewer move the percentage a great deal. The comparison that says something is the one with the same month of the previous year, because the series is strongly seasonal — construction is authorised in summer.

The 42 counties add up exactly to the national figure, checked at every import.

History

The last 24 months. The figures are in permits.
Period Building permits
August 2026 44
July 2026 68
June 2026 52
May 2026 40
April 2026 45
March 2026 44
February 2026 33
January 2026 32
December 2025 52
November 2025 35
October 2025 52
September 2025 47
August 2025 59
July 2025 56
June 2025 70
May 2025 58
April 2025 54
March 2025 57
February 2025 42
January 2025 33
December 2024 51
November 2024 21
October 2024 61
September 2024 45

Toate the counties

AlbaAradArgeșBacăuBihorBistrița-NăsăudBotoșaniBrăilaBrașovBuzăuCălărașiCaraș-SeverinClujConstanțaCovasnaDâmbovițaDoljGalațiGiurgiuGorjHarghitaHunedoaraIalomițaIașiIlfovMaramureșMehedințiBucharest MunicipalityMureșNeamțOltPrahovaSălajSatu MareSibiuSuceavaTeleormanTimișTulceaVâlceaVasluiVrancea

Source: National Institute of Statistics (INS), matrix LOC108A. Period covered: January 2002 – August 2026. See the source.

The series is for residential buildings, excluding those for communities. Unlike the national figure, which is published unbroken across all 295 months, a county may have months with no published figure at all — the chart breaks there, no line is drawn across. The series is strongly seasonal, so the comparison that says something is the one with the same month of the previous year.