Building permits in Neamț County

How many building permits for residential buildings are issued each month in Neamț County.

Ranked 20 of 42, in September 2026.

Building permits

42 permits

September 2026

−38 (−47.50%) vs August 2026 −92 (−68.66%) vs September 2025

The “Building permits” series

Series high
496 permitsOctober 2008
Series low
29 permitsJanuary 2025
Months published
297since January 2002

Trends

Building permits · solid line
Building permits in Neamț County, Last 10 years The monthly trend of Building permits in Neamț County, from October 2016 to September 2026, in permits. Valoarea a trecut de la 68 la 42. The exact figures are in the table below. 0 50 100 150 maxim 134 minim 29 42
Building permits · solid line
Building permits in Neamț County, Last 12 months The monthly trend of Building permits in Neamț County, from October 2025 to September 2026, in permits. Valoarea a trecut de la 70 la 42. The exact figures are in the table below. 40 50 60 70 80 maxim 80 42

What it means

A building permit is the act of the local administration on the basis of which the rules on the siting, design, execution and operation of constructions are applied. It is issued with a view to the START of the works, so their number says what is intended to be built, not what was built.

The forms are filled in by the prefectures and by the county and local councils. The figures here are for residential buildings, excluding those for communities, and they also cover extensions to existing residential buildings.

A county's figures are small, so the change from one month to the next is large by chance: a few permits more or fewer move the percentage a great deal. The comparison that says something is the one with the same month of the previous year, because the series is strongly seasonal — construction is authorised in summer.

The 42 counties add up exactly to the national figure, checked at every import.

History

The last 24 months. The figures are in permits.
Period Building permits
September 2026 42
August 2026 80
July 2026 58
June 2026 67
May 2026 48
April 2026 76
March 2026 55
February 2026 51
January 2026 44
December 2025 57
November 2025 77
October 2025 70
September 2025 134
August 2025 98
July 2025 85
June 2025 94
May 2025 89
April 2025 72
March 2025 79
February 2025 56
January 2025 29
December 2024 52
November 2024 57
October 2024 65

Toate the counties

AlbaAradArgeșBacăuBihorBistrița-NăsăudBotoșaniBrăilaBrașovBuzăuCălărașiCaraș-SeverinClujConstanțaCovasnaDâmbovițaDoljGalațiGiurgiuGorjHarghitaHunedoaraIalomițaIașiIlfovMaramureșMehedințiBucharest MunicipalityMureșNeamțOltPrahovaSălajSatu MareSibiuSuceavaTeleormanTimișTulceaVâlceaVasluiVrancea

Source: National Institute of Statistics (INS), matrix LOC108A. Period covered: January 2002 – September 2026. See the source.

The series is for residential buildings, excluding those for communities. Unlike the national figure, which is published unbroken across all 295 months, a county may have months with no published figure at all — the chart breaks there, no line is drawn across. The series is strongly seasonal, so the comparison that says something is the one with the same month of the previous year.