Date oficiale · National Institute of Statistics (INS)

Building permits in Giurgiu County

How many building permits for residential buildings are issued each month in Giurgiu County.

Ranked 22 of 42, in August 2026.

Building permits

52 permits

August 2026

+17 (+48.57%) vs July 2026 −17 (−24.64%) vs August 2025

The “Building permits” series

Series high
114 permitsNovember 2021
Series low
8 permitsJanuary 2005
Months published
296since January 2002

Trends

Building permits · solid line
Building permits in Giurgiu County, Last 10 years The monthly trend of Building permits in Giurgiu County, from September 2016 to August 2026, in permits. Valoarea a trecut de la 51 la 52. The exact figures are in the table below. 0 25 50 75 100 125 maxim 114 minim 23 52
Building permits · solid line
Building permits in Giurgiu County, Last 12 months The monthly trend of Building permits in Giurgiu County, from September 2025 to August 2026, in permits. Valoarea a trecut de la 50 la 52. The exact figures are in the table below. 30 40 50 60 70 maxim 65 minim 34 52

What it means

A building permit is the act of the local administration on the basis of which the rules on the siting, design, execution and operation of constructions are applied. It is issued with a view to the START of the works, so their number says what is intended to be built, not what was built.

The forms are filled in by the prefectures and by the county and local councils. The figures here are for residential buildings, excluding those for communities, and they also cover extensions to existing residential buildings.

A county's figures are small, so the change from one month to the next is large by chance: a few permits more or fewer move the percentage a great deal. The comparison that says something is the one with the same month of the previous year, because the series is strongly seasonal — construction is authorised in summer.

The 42 counties add up exactly to the national figure, checked at every import.

History

The last 24 months. The figures are in permits.
Period Building permits
August 2026 52
July 2026 35
June 2026 56
May 2026 64
April 2026 42
March 2026 51
February 2026 51
January 2026 65
December 2025 34
November 2025 62
October 2025 47
September 2025 50
August 2025 69
July 2025 67
June 2025 39
May 2025 51
April 2025 56
March 2025 59
February 2025 34
January 2025 36
December 2024 97
November 2024 31
October 2024 69
September 2024 63

Toate the counties

AlbaAradArgeșBacăuBihorBistrița-NăsăudBotoșaniBrăilaBrașovBuzăuCălărașiCaraș-SeverinClujConstanțaCovasnaDâmbovițaDoljGalațiGiurgiuGorjHarghitaHunedoaraIalomițaIașiIlfovMaramureșMehedințiBucharest MunicipalityMureșNeamțOltPrahovaSălajSatu MareSibiuSuceavaTeleormanTimișTulceaVâlceaVasluiVrancea

Source: National Institute of Statistics (INS), matrix LOC108A. Period covered: January 2002 – August 2026. See the source.

The series is for residential buildings, excluding those for communities. Unlike the national figure, which is published unbroken across all 295 months, a county may have months with no published figure at all — the chart breaks there, no line is drawn across. The series is strongly seasonal, so the comparison that says something is the one with the same month of the previous year.