Date oficiale · National Institute of Statistics (INS)

Building permits in Brașov County

How many building permits for residential buildings are issued each month in Brașov County.

Ranked 9 of 42, in September 2026.

Building permits

82 permits

September 2026

−15 (−15.46%) vs August 2026 −81 (−49.69%) vs September 2025

The “Building permits” series

Series high
293 permitsSeptember 2021
Series low
13 permitsJanuary 2002
Months published
297since January 2002

Trends

Building permits · solid line
Building permits in Brașov County, Last 10 years The monthly trend of Building permits in Brașov County, from October 2016 to September 2026, in permits. Valoarea a trecut de la 38 la 82. The exact figures are in the table below. 0 100 200 300 maxim 293 minim 23 82
Building permits · solid line
Building permits in Brașov County, Last 12 months The monthly trend of Building permits in Brașov County, from October 2025 to September 2026, in permits. Valoarea a trecut de la 96 la 82. The exact figures are in the table below. 20 40 60 80 100 maxim 99 minim 35 82

What it means

A building permit is the act of the local administration on the basis of which the rules on the siting, design, execution and operation of constructions are applied. It is issued with a view to the START of the works, so their number says what is intended to be built, not what was built.

The forms are filled in by the prefectures and by the county and local councils. The figures here are for residential buildings, excluding those for communities, and they also cover extensions to existing residential buildings.

A county's figures are small, so the change from one month to the next is large by chance: a few permits more or fewer move the percentage a great deal. The comparison that says something is the one with the same month of the previous year, because the series is strongly seasonal — construction is authorised in summer.

The 42 counties add up exactly to the national figure, checked at every import.

History

The last 24 months. The figures are in permits.
Period Building permits
September 2026 82
August 2026 97
July 2026 74
June 2026 99
May 2026 80
April 2026 93
March 2026 92
February 2026 69
January 2026 35
December 2025 99
November 2025 97
October 2025 96
September 2025 163
August 2025 264
July 2025 94
June 2025 113
May 2025 82
April 2025 68
March 2025 76
February 2025 87
January 2025 60
December 2024 106
November 2024 107
October 2024 88

Toate the counties

AlbaAradArgeșBacăuBihorBistrița-NăsăudBotoșaniBrăilaBrașovBuzăuCălărașiCaraș-SeverinClujConstanțaCovasnaDâmbovițaDoljGalațiGiurgiuGorjHarghitaHunedoaraIalomițaIașiIlfovMaramureșMehedințiBucharest MunicipalityMureșNeamțOltPrahovaSălajSatu MareSibiuSuceavaTeleormanTimișTulceaVâlceaVasluiVrancea

Source: National Institute of Statistics (INS), matrix LOC108A. Period covered: January 2002 – September 2026. See the source.

The series is for residential buildings, excluding those for communities. Unlike the national figure, which is published unbroken across all 295 months, a county may have months with no published figure at all — the chart breaks there, no line is drawn across. The series is strongly seasonal, so the comparison that says something is the one with the same month of the previous year.